Merck entrusted ERAS with the replacement of the existing GTC and the GTC extension on its site in Semoy.

Client:

MERCK SANTE

Location:

France

Date:

2013

Duration:

5 months

Project description:

The client wanted to replace the existing GTC phase 1 (500 points) and extend the GTC in phase 2 with 500 points, enabling reporting for the analysis and optimisation of energy consumption at Semoy site.

ERAS scope:

  • Proposal for a new flexible and robust architecture.
  • Drawing up the study documentation (MSDS, SDS).
  • Configuration of ALERT software for on-call system.
  • Providing and configuring servers (processing and database).
  • Monitoring system of GTC through BacNet/IP.
  • Supervision of counters EDF.
  • Commissioning FAT/SAT.

 