DUPONT de NEMOURS: Pressure relief devices audit

ERAS plus-point: PRD (Pressure relief devices) verification.

Project Description:

 

  • Pressure relief devices sizing verification
  • Rupture disks and safety valves audit
  • Study of the different overpressure scenarios.
  • Physical properties for chemical mixtures
  • Development of spreadsheets for rupture disks and safety valves (single-phase and two-phase cases).
  • Calculation of the required orifice diameter in case of overpressure scenario.
  • Checking of the compliance of current equipment and research of solutions in order to reach compliancy.


Location:

Cernay (68) - France

Date:

2016

Duration:

5 months

Number of working hours:

1700