Major Project
Major Project
Bioactive ingredient
Design and construction Greenfield of a complete plant including the active ingredient production unit, a quality control laboratory, outdoor storage warehouses, recycling units, the utilities, the effluent pretreatment, the maintenance workshop, and the offices.
Our teams were tasked with carrying out:
- Preliminary Design (Basic Design),
- Final Design (APD) for all trades.
Key figures: 50 PIDs, 11,000 m² of floor space, 9 buildings
#Fermentation #Biotechnology #PharmaceuticalQualification #Eco-design